Where your quantity sits against the 1/5/10/25/50/100/250/500/1000 break points (just under a break is the expensive place to be)
Materials and specification of the item
Quantity and where it falls against a vendor's price breaks
Finishing, customization, or add-on services
Check before signing
Setup or one-time fees charged per unit or repeated on reorders
A specification quietly changed from what you asked for
Rush surcharges applied to a standard timeline
Line items bundled into a single total so individual prices can't be compared
Negotiation levers
Standardize the specification so vendors quote like-for-like
Consolidate volume or designs to share fixed costs
Offer schedule flexibility in exchange for a better rate
About 20 oz. bike sports bottle pricing
Priced per unit with quantity breaks. Vendors quote steps at 1 / 5 / 10 / 25 / 50 / 100 / 250 / 500 / 1000 units, and the per-unit rate drops at each break.
Why do two quotes for the same item differ so much?
Usually a specification or finishing difference, not the core work. Ask both vendors to quote the identical spec and the gap normally narrows.